Another major drainage emergency successfully resolved
Location: Central London | Completed: 12 Jun 2026
This project was anything but straightforward. We arrived to find the pump discharge line completely blocked from the pumping station to the roadside, with the gravity line it discharged into having completely collapsed.
Our team entered the pump pit to disconnect the pumps and manifold before cleaning the entire discharge line section by section. Once the blockage was cleared, we replaced the collapsed gravity line to restore the system.
To ensure our client's businesses could continue operating without disruption, we had two tankers on site managing the continuous flow from the restaurants throughout the works.
Working around the clock, our team pulled together to get everything back up and running safely and as quickly as possible.
A fantastic effort from everyone involved—another challenging job completed with minimal disruption to the client.